Fill is sold by the cubic yard or the ton, but jobs are measured in feet. The conversion is simple: multiply length by width by depth, all in feet, and divide by 27. A pad that is 40 feet by 30 feet raised 1 foot needs about 44 cubic yards before compaction.
Compaction is where most estimates go wrong. Loose fill shrinks when it is compacted, often by 15 to 25 percent depending on the material. If your finished grade has to be a full foot higher, order for the loose volume, not the finished volume. For the pad above, that means closer to 52 to 55 cubic yards.
Next, convert to trucks. Our dump trucks carry 10 to 22 tons per load. Fill dirt weighs roughly 1.1 to 1.4 tons per cubic yard depending on moisture and type, so a full-size load is in the range of 14 to 18 cubic yards. The 40 by 30 pad works out to three or four loads.
Two practical tips. First, tell your dispatcher what the fill is for. A structural house pad calls for compactable material, while backfilling around a pool can use general clean fill. Second, schedule the last load as a maybe. It is easier to cancel one truck than to wait a day for one more.
If you would rather not do the math, send us the dimensions and the purpose. We will work out the yardage and the truck count with your quote.